Systemy Inżynieryjne - Wiedza o Produkcji
All components pass a quality inspection before being used. Many different methods and procedures are used here (e.g. PMI 0 positive material inspection, crack detection).
Our scope of machining reaches from chipping/metal cutting to sandblasting (using granule materials) to welding, assembling and painting.
We handle many different metallic and nonmetallic materials as steel, stainless steel, duplex materials, titanium, plastic material
We give a big importance to welding: Nash employees are certified according to ASME 9 and therefore qualified to manufacture pressure vessels and piping according to Pressure Equipment Directive (DIN EN 3834) and ASME Standards (31.3).
Our systems are painted according to customer specification. We work with all wet paints and 2K paints. Anti-corrosion-coatings up to category C5M are possible. Of course, we meet all the other specifications, e.g. regarding coating thickness, as well.
The electrical engineering is also done in the Nash location, from design to cabling.
After the completion, the system undergoes a pressure test. Furthermore there is an option to do a complete function test to verify the performance data.
Nash is certified according to ISO 9001 and ISO 14001.